On-site Productivity Issues
In recent years, productivity in the UK’s construction sector has plummeted. Although the latest ONS data shows a minor increase in productivity at the end of 2017, the Government is still desperate for the construction sector to increase its output - claiming that increasing productivity and build numbers could add up to £15 billion to the UK economy each year.
A number of manufacturers that operate in the construction supply chain, such as Polypipe Terrain, have been harnessing the benefits of factory manufacturing and offsite construction as a solution to decreasing productivity.
One of the easiest ways to speed up on-site builds is to keep things simple. Using fabricated drainage stacks which arrive on site complete and ready to install is one way to speed up proceedings. This helps contractors to get things moving more quickly, with an accurate, efficient installation process.
Additionally, the choice of materials can have a huge impact on productivity. When compared to alternative materials, plastic drainage pipes can negate the need for skilled labourers and allow the project to be completed much more quickly. Not only will this allow contractors to focus elsewhere, but it will also help budgets work harder.
Find out more about fabricated drainage stacks from Polypipe Terrain.
[edit] Related articles on Designing Buildings Wiki
- Advanced construction technology.
- BRE Üserhuus
- British post-war mass housing.
- Design for deconstruction.
- Design for Manufacture and Assembly (DfMA).
- Fabricated drainage stacks.
- Flying factory.
- In situ.
- Kit house.
- Modern methods of construction.
- Modular buildings.
- Offsite manufacturing.
- Off site materials.
- Off-site construction.
- Off-site prefabrication of buildings: A guide to connection choices.
- On site.
- Prefabrication.
- Prefabricated structural panels.
- Ronan Point.
- Secondary Ventilation Stacks in Tall Buildings.
- Y:Cube development in Mitcham.
Featured articles and news
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
A dynamic brand built for impact stitched into BSRIA’s building fabric.